An year ago

To talk about costs, the huge Lezírias bridge costed 100 million euro, the new bridge that links Oporto and Gaia, that was to be built on the place where I conceived and designed an youth hostel, when I was at 1st year at FAUP, is now intended to host a bridge that cost 4500 million euro, about 45 times more than that huge Lezirias bridge, that somehow the government of mr. Sócrates did.
The rest is linked to the airways. 2 or 3 airports could be build at the cost of 25 million euro, I even could design one of those for Montereal or Viseu. Beja has its airport. No problem also with ports, I think.
The cost for instance of Oporto’s airport requalification works was 500 million euro.
Politicians should do policies atending to a relation between costs and profits.